Home / News / Details

Maintenance Manual For Water Chiller in Summer

Maintenance Manual For Water Chiller in summer

1

1Installation Environment

The chiller is equipped with universal wheel, The unit should be secured in a well-ventilated place to ensure good heat dissipation. As shown in the right picture, there should be a space of 1 meter around the unit, there should be no obstructions, and the height above the machine is more than 3 meter.

2

2、  The heat sink should be regularly cleaned(every 15 days)  

34

3. Reset switch (device alarm E03 or high voltage overload,   Please manually press the reset button to reset)

5


4. Internal Filter Cleaning Process

10

➢ Seeking deep, not seeking wide: Cheeron laser always dedicates to laser cutting machine what we are good at.

➢ Customers is the only reason we exist, we grow up with our customers together.

➢ We are not only providing laser products, but also solutions of production efficiency improvement.

➢ What we offer is high quality products and services instead of low prices.

Thank you very much for your trust in Cheeron laser, and choose Cheeron laser as your partner!!!


Send Inquiry